Deepwater Solutions

Delivering the lowest cost-per-foot reservoir in deepwater and ultra-deepwater environments.

Deepwater exploration and production presents some of the industry’s most complex challenges, requires three times upfront capital investments compared to onshore operations, and requires long-term commitments —but brings the greatest potential rewards.

Halliburton has an extensive track-record in deepwater plays worldwide, with the basin knowledge and reservoir expertise to help you overcome your greatest deepwater challenges. Whether drilling through pre-salt reservoirs in Brazil, deploying complex completions in the Gulf of Mexico, dealing with high-pressure/high-temperature wells in Asia Pacific, to exploring new frontiers in West Africa, our experts are ready to help you increase production and lower costs at every stage of the well’s lifecycle – in deep water and ultra-deep water environments.

  • Reduce Uncertainty

    Advanced suite of coring, testing, MWD/LWD and formation evaluation solutions provide accurate and reliable subsurface data, helping you make long-term investment and exploration decisions.
  • Increase Reliability

    Safe, efficient, proven HP/HT solutions designed to maximize production in the most adverse conditions, helping you reduce NPT, mitigate risks, and improve overall well economics.
  • Increase Efficiency

    Reliable, high-performing drilling equipment and fluids designed to optimize well construction, manage low-ECDs, and reach target depth in one run, helping you save rig time and costs.

Every step of the way, let’s work together to maximize the value of your deepwater assets.

Request Info
Deepwater Reservoir Solution Center (DW-RSC)

Deepwater Reservoir Solution Center

Deepwater geoscientists provide reservoir insight to reduce uncertainty across several domains: geology, geophysics, geomechanics, petrophysics, and reservoir and production engineering.
Environmentally Distinctive Burner

Environmentally Distinctive Burner

2015 E&P MEA Winner, HSE
With industry-leading burn performance and automation, it's designed for the most eco-sensitive areas where it's critical to quantify emissions.

SaltShield™ Cement

2015 E&P MEA Winner, Drilling Fluids/Stimulation
SaltShield cement is field proven to help operators more predictably mitigate the unexpected NPT and operational expenses from salt zones.
  = Sign in required
Filter By  
Show     results per page
  Title Date
Summary Advanced Completion Solutions for Multizone Water Injection in Soft Sand Feb 2019
Summary Successful Indirect Displacement and Wellbore Cleanout in High-Angle Deepwater Well Saves 24 Hours of Rig Time Feb 2019
Summary Halliburton Installs 300th FlexRite® System, Including Over 100 FlexRite MIC Junctions, In North Sea Jan 2019
Summary Operator Identifies Bypassed Pay and Increases Pay Zone by 50% in Water-flooded Reservoir Dec 2018
Summary Swellpacker® System Enables Complete Zonal Isolation During Well Construction Dec 2018
Summary Thailand: Operator Drills Gulf of Thailand’s Longest Openhole Production Section in One Run Nov 2018
Summary Integrated Operation Saves Operator Five Hours of Rig Time Oct 2018
Summary Custom Dual Solids Control Systems on Drillship Maintain High-Rate Processing Over Five-Well Program with Zero NPT Sep 2018
Summary BaraXcel™ HP NAF System Eliminates Two Intervals and Cuts Rig Time in Half Aug 2018
Summary Customized BaraXcel™ HP NAF Aug 2018
Summary Customized BaraXcel™ Fluid System Aug 2018
Summary BaraXcel™-N HP NAF and BARACARB® LCM Enable Operator to Avoid Sticking Issues in Depleted Sands Aug 2018
Summary Continuous Injection of DeepSure Certified LDHI Outperforms Previous Hydrate Treatment Aug 2018
Summary Swellable Packer Solves Casing Challenge, Successfully Sealing and Anchoring Tieback Liner Aug 2018
Summary Intercept® Retrievable Bridge Plug is Successfully Installed and Then Retrieved After Nine Months in Wellbore Aug 2018
Summary Halliburton Retrievable Tools Save Operator $750,000 Jul 2018
Summary eRED® Valve Provides Efficiencies and Time Savings in Downhole Operations Jul 2018
Summary eRED® Valves Save 88 Hours of Rig Time for Upper Completion Project Jun 2018
Summary Brazil: Engineered Solution Maximizes Drilling in Pre-Salt Carbonate Formation, Saving USD 833,000 May 2018
Summary Integrated Drilling and Logging Approach Maximizes Formation Reservoir Exposure Apr 2018
Summary Intercept® Retrievable Bridge Plug Provides V0 Barrier on Two Batch Wells with Zero NPT Apr 2018
Summary Remediation of Asphaltenesin Deep Water Wells Results in 2,000 BOPD Production Increase Apr 2018
Summary Integration Drives Performance and Accelerates Learning Curve in an Ultra-Deepwater Pre-Salt Exploration Drilling Project in Brazil Mar 2018
Summary CleanWell® Technology Saves $1.6 Million on Two Wells Feb 2018
Summary CleanWell® Technology Saves Two Days of Rig Time Offshore Feb 2018
Summary Operator Prevents Paraffin Deposition in 20-mile Deep Water Subsea Tieback in GOM Jan 2018
Summary Combo MOTF and SSRV System Saves Casing Run in Deepwater Development Nov 2017
Summary Halliburton Makes Splash in Deep Water — Saving Operator USD 1.2 Million in Rig Time Nov 2017
Summary Combo LCM Pill Stems Losses in Deeply Fractured Carbonate Formation Nov 2017
Summary FS2 Fluid Loss Isolation Barrier Valves Contribute to Successful Completion on Deepwater Project Oct 2017
Summary GOM: Rotary Steerable System and Industry’s Closest At-Bit Reamer Save Operator 48 Hours and USD 2 Million Oct 2017
Summary eRED® Valve Replaces Ball-Drop Method to Set Hydraulic Packer Sep 2017
Summary Baroid Helps Operator in Norway Save US$679,000 on Offshore Well Sep 2017
Summary Swellpacker® Systems Help Save $3 Million by Reducing Rig Time Aug 2017
Summary Brazil: Operator Saves USD 3.4 Million in Presalt Drilling Aug 2017
Summary USA, Southern: Operator Reduces Wellbore Position Uncertainty and Avoids Potential Costly Sidetracks for a Blowout Relief Well Jul 2017
Summary Swellpacker® Systems Change Well Behavior and Increase Production by 2,000 BPD Jul 2017
Summary XtremeGrip™ System Offers Metal-to-Metal Solution Jul 2017
Summary BaraECD® Fluid System and WellSET® Wellbore Strengthening Treatment Solve Deepwater Subsalt Drilling Challenges Jun 2017
Summary BaraECD® Non-Aqueous Fluid System Helps Customer Reach Reservoir in The Netherlands Jun 2017
Summary eMotion®-LV Remotely Operated Barrier Valve Allows Interventionless Completion Installation Apr 2017
Summary Halliburton Integrated Well Intervention Vessel (IWIV) Spearheads Operational Efficiency in Gravel Packing Apr 2017
Summary Use of Remotely Operated Technology Saves 45 Hours Rig Time Apr 2017
Summary CleanWell Systems shave seven hours of rig time for Asia Pacific operator Apr 2017
Summary Streamlined Well Construction Eliminates 71 Days of Rig Time, Saving Consortium USD 90 Million Apr 2017
Summary Operator Streamlines Intervention Operations in Deep Water with Dash® Large Bore Subsea Safety System Apr 2017
Summary Operator Achieves Record Results in West Africa Deepwater Completions Project Apr 2017
Summary Offshore Egypt Rigless Wireline Intervention Solution Adds 4,000 BOPD with Zero Water Production Apr 2017
Summary Oman: Operator Proves Cost Savings With LWD High-Resolution Imaging Service Mar 2017
Summary USA, North Dakota Bakken: Operator Achieves More Accurate Wellbore Placement Using a New Azimuthal Gamma Ray Service Jan 2017
Showing 1 - 50 of 186 Records
1   2   3   4   [Next]
Resources

Resources

Related Information

Related Information

Follow Us:
Careers
Job Openings
Halliburton. All Rights Reserved. | Terms of Use | Privacy Statement | Garnishment | Site Map
Halliburton. All Rights Reserved.